More building…12V electrical system guts.

15 02 2010

This has been a good weekend for electriceptor.  I was able to work on the 3 cell packs on saturday, and also make sure that the existing 12V electrical system works properly too.

At some point, i decided to strip the bike down to the frame so that i could get it sandblasted and re-powder coated.  During this process, Read the rest of this entry »